Laying of Services and Soakholes

  • To ensure the future access to Green 3, services are laid from Tutchen Street to the Greenkeeper shed.
  • The two soak holes that will ensure that any excess water on Green 2 or Green 3 have adequate run-off are connected with 150 mm pipes.


Materials Arrive on-site and the old "Parking Lot" is removed.

  • Drainage materials are onsite which will be laid under the aggregate to divert the overflow water towards the soak holes in the event of heavy rain.
  • The original Green 2 is removed and graded with constant laser levelling to ensure the ground where the green will be built is level.